HTC's first patient
The brand new £97million Heartlands Treatment Centre (HTC) opened its doors and treated its first ever patient.
HTC handover ceremony
During the handover event, Kier were thanked for completing the construction of the HTC on time and on budget.
HTC staff: Kay Hodgkisson
Facilities Operations Manager, Kay, talks about the benefits that the new HTC will bring to her team, as well as patients.
HTC staff: Simon O'Sullivan
Procedure Recovery Floor Matron, Simon, talks about some the benefits that the new centre will bring to both staff and patients.
HTC theatres
Within the HTC, state-of-the-art technology has been installed including brand new theatre suites. Find out more in our video.
HTC construction
Time lapse video of the Heartlands Treatment Centre construction process which was shown during the HTC handover ceremony.
Link bridge breakthrough
Heartlands Hospital and the new HTC are now connected following the break-through of the corridor linking the buildings.
CT diagnostics at HTC
Video detailing the specialist and general procedures that the new CT scanners at the HTC can perform.
MRI scanner installation
Video footage of the new MRI scanner, funded by UHB Charity, being delivered and installed at the HTC site.
HTC roof progress
Time lapse video showing the build progress of the roof structure on the new HTC building at Heartlands Hospital.
Topping off ceremony
Video footage of the topping off ceremony, marking a significant stage in the Heartlands Treatment Centre construction.
Time lapse and drone footage
Video containing a time lapse sequence and aerial drone footage of the construction work being completed on the HTC site.
Virtual visit and time capsule burial
Video covering the virtual visit from the Department of Health and a time capsule burial to mark the start of HTC construction.
Bordesley House demolition
Video footage from the demolition of Bordesley House which formed part of preliminary enabling works for the HTC site.
Oncology bungalow demolition
Time lapse video of the Oncology bungalow demolition that was required as part of the HTC preliminary enabling works.
Self check-in at HTC
At the Heartlands Treatment Centre, patients will be able to self check-in for appointments such as outpatients and fracture clinics.
Virtual HTC fly-through
Bringing the multi-million pound building to life, the fly-through video gives viewers the opportunity to feel like they are walking through the new building.
Last reviewed: 06 November 2024